Electrical Installation Works 

SVT Group carries out a full range of construction electrical installation services for new buildings from the ground up, as well as for buildings and structures that require modernization and reconstruction.  These include commercial, administrative, and residential properties, involving the installation of electrical networks, electrical equipment, low-current systems. 

The general sequence of electrical installation work is typically as follows: 

  1. Dismantling (if necessary); 
  2. Preparation and marking of the cable route (line); 
  3. Execution of mechanical works (if necessary); 
  4. Laying cables and wires; 
  5. Installation of electrical equipment and fittings; 
  6. Integration of cables into a single system; 
  7. Commissioning and setup work. 

The electrical installation work performed by SVT Group includes the following types of services: 

  • Installation of cable support systems 
  • Cable and wire laying 
  • Cable and wire connection 
  • Installation and adjustment of low-voltage switching devices 
  • Assembly and installation of electrical panel equipment 
  • Installation of electrical fittings 
  • Installation of electrical lighting systems 
  • Installation of lighting equipment 
  • Assembly and installation of lighting panels 
  • Installation and laying of communication networks 
  • Dismantling of wiring, electrical fittings, etc. 

Concrete Works

Concrete work involves the construction of buildings, structures, and components through the process of concreting. The primary material used in these tasks is concrete mix, produced by combining cement, crushed stone or gravel, additives, and water. 

Structures created during concrete work include monolithic floors, monolithic walls, monolithic columns, monolithic steps, staircases, concrete slabs, retaining walls, foundations, and monolithic floors. 

These activities in the construction of various buildings and structures are complex and labor-intensive. Conducting concrete work requires strict adherence to all construction technologies, as quality and durability of the building structures depend on this. Therefore, it is best to entrust these procedures to highly qualified professionals.

Characteristics and types of concrete works

Concrete works is performed in the construction of various types of structures for different purposes. Primarily, it includes laying the foundation for a future building. The foundation is the base of any structure, so its durability directly depends on the quality of pouring, uniform settling, correct mixture proportions, and the absence of voids, chips, and cracks. Foundation pouring can be done using either the strip or monolithic method.

Concrete is one of the most common and accessible types of building materials. It results from the hardening of a concrete mixture consisting of cement, water, and other fillers, including modern polymer and plasticizing additives. The applications for concrete are expanding each year due to its affordability and excellent strength and performance characteristics, such as reliability, durability, resistance to environmental influences, and versatility in all construction areas.

A strip foundation is a reinforced concrete strip that runs along the entire perimeter of a future structure, while a monolithic foundation is a solid slab placed on a sand cushion. Monolithic foundations are a versatile solution for constructing almost any type of structure, including those on unstable soils.

Concrete works is also performed for the construction of support and decorative columns. This process involves installing vertical pipes around the perimeter of the building under construction, which provide maximum rigidity and strength for the future structure. Monolithic concrete columns can be erected in a relatively short time, significantly reducing costs.

An important construction stage is wall erection. In this case, concrete work can be done using two primary methods: monolithic or with lightweight solutions such as expanded clay concrete, foam concrete, or polystyrene concrete. The same applies to floor construction in both industrial and residential spaces. During the project planning stage, it is essential to consider calculated loads, bearing capacity of concrete structures, slab thickness, and the appropriate type of reinforcement. 

Reinforcement of structures 

Concrete can take on virtually any shape, maintains its properties across a wide temperature range, and, most importantly, is highly durable. However, under the effects of chemical and physical corrosion, concrete products can begin to deteriorate, posing a risk to the integrity of constructed structures. Reinforcing concrete is essential to increase the strength of products and prevent cracks after the concrete mixture hardens. 

Purpose and types of reinforcement 

Many factors negatively impact the integrity of concrete structures and individual structural elements. These include wind and precipitation, seismic loads, soil erosion by groundwater, seasonal floods, and temperature fluctuations. A rigid framework helps minimize the impact of these factors and significantly broadens the range of applications for concrete. 

Reinforcing products come in various forms: 

  • Hot-rolled steel profile;
  • Reinforcing wire, cold-rolled tape ;
  • Rods with rare earth metal additives and heat treatment;
  • Composite products (carbon fiber);
  • Fiberglass fiber;
  • Basalt threads.

Modern builders often replace traditional steel reinforcement products with composite fiber. The absence of metal in the frame structure prevents rust formation. However, fiberglass and carbon fiber derivatives have limited heat resistance and flexibility, so it is too early to fully abandon steel profiles or wire in reinforcement.

The reinforcement method depends on the specifics of the product and the type of reinforcement used. For pouring strip foundations or slabs, monolithic reinforcement is applied: wire or rods are pre-connected to form a mesh frame, and then the concrete mixture is poured. For producing particularly strong products, the dispersion method is used, where steel, basalt, or fiberglass fiber is added to the mix. The simplest approach is mesh reinforcement, with prefabricated mesh ready for installation.

Stages of work during monolithic foundation reinforcement carried out by SVT Group 

  • Conducting earthworks to prepare the form for the foundation;
  • Setting up formwork;
  • Calculating the reinforcement frame and determining the spacing between rods;
  • Connecting the rods by welding or tying;
  • Pouring and compacting the concrete mixture;
  • Allowing the mixture to harden until it reaches a solid state (about 14 days).

Stages of concrete works performed by SVT Group 

As is well known, concrete is an essential component of any construction. The technology for its implementation can be conditionally divided into several key stages: 

  • Transportation of basic materials to the site;
  • Preparatory work, including the creation of formwork;
  • Preparation of the concrete mix;
  • Pouring;
  • Subsequent processing and formwork removal.

The preparatory stage includes selecting the appropriate concrete mix (chosen based on the type of future structure), as well as the type and material of the formwork. These components affect almost the entire subsequent concreting process. Proper preparation and adherence to the corresponding technology for mixing and pouring will ensure even filling of the entire formwork area and the hardening of the mixture within the specified time. 

The process of subsequent processing and care involves a set of activities that ensure the fresh concrete achieves the correct operational state. Most often, these activities include maintaining optimal temperature, periodic watering, limiting exposure to vibrations, shocks, impacts, and other mechanical forces. Formwork removal should be done as carefully as possible. If there are any projections left after removing the formwork, they can be gently chipped away with a chisel.

Tips and recommendations 

Carrying out construction procedures of this nature typically requires the intervention of experienced professionals, as well as a knowledgeable choice of the right, reliable, and high-quality materials. Our company guarantees qualified execution and control of concrete work, which ensures maximum reliability, safety, and durability of the finished structures. We offer the best conditions for our clients and, importantly, reasonable prices, while adhering to deadlines for work completion. Contact our consultants for more information. 

Concrete works performed by SVT Group includes the following types of work: 

  • Reinforced concrete work, reinforcement 
  • Preparation and installation of formwork 
  • Laying and compacting the concrete mixture 
  • Curing of concrete during hardening 
  • Formwork removal 
  • Treatment of concrete surfaces 
  • Acceptance of concrete 

Stone work 

Stone work is the production of stone masonry in the form of joining natural stone (cobbles, boulders, rubble stone, granite) and artificial stones using lime or cement mortars, concrete, iron ties, and others. 

Types of masonry: 

Rubble masonry – made from natural stones 

Rubble-concrete masonry – made from rubble and concrete 

Ashlar masonry – made from processed stones (cladding) 

Brick masonry – made from clay or silicate bricks 

Small-block masonry – made from artificial stones (slag block) or natural stones (limestone, tuff) 

Lightweight masonry – masonry with insulation 

Cladding masonry – rubble or small-block, clad with brick or brick clad with slabs. 

Mortars for stone masonry 

Purpose of mortar: to bond stones, distribute force evenly between stones, level surface irregularities on stones, and protect masonry from drafts and moisture penetration.

According to the binding agents used, mortars are divided into simple (with one type of binder) and complex (with mixed binders). 

The following mortars are mainly used in stone masonry: 

Lime mortars – in dry areas for low loads; 

Lime-cement mortars – in almost all types of masonry; 

Cement mortars – for columns, lintels, arches, vaults, and underground structures; 

Clay and gypsum mortars are used very rarely, only in dry regions. 

By average density, mortars are divided into light (warm) with a bulk density up to 1500 kg/m³ and heavy (cold) with more than 1500 kg/m³. Compressive strength of mortars at design age is indicated by grades 4, 10, 25, 50, 75, 100, 150, 200. In winter, grades 10, 15, 35, 100, 150, 200, 300. Mortar grades are specified in the project, and their composition is usually selected in a construction laboratory.

Various plasticizers (sulfite-alcohol slop, superplasticizer S-3, etc.) are used to increase plasticity. 

Mortar workability is determined by the settling depth of a standard cone: for rubble masonry – 4-6 cm, for regular brick masonry – 7-12 cm, for slag block masonry – 8-12 cm. 

The project specifies the standard cone depth. 

Based on joint filling, masonry joints may be flush if exterior walls are not plastered, or hollow (1–1.5 cm voids to the brick edge) if the wall will later be plastered. 

Rubble and rubble-concrete masonry 

Rubble masonry is used for foundations (from natural stones weighing up to 50 kg), basement walls, and supports under columns.

Grouting masonry. Rows 0.15–0.2 m thick are laid tightly in a trench or formwork, with voids filled with gravel, then poured with mortar with a cone slump of 13–15 cm

Not all joints are filled, so this method is used for foundations of buildings no more than two stories high. 

Spade masonry. Facing rows 0.3 m thick are laid using mortar with a cone slump of 4–6 cm. Stones are set with a sledgehammer. 

Stones for filling are laid with mortar in the gaps between the facing rows. 

Vibrational masonry. Stones are laid using a vibrator, making the masonry denser. 

Masonry with cladding. The masonry is clad with brick or hewn stone with mandatory bonding. 

Rubble-concrete masonry. Made from concrete and rubble stone, with rubble stones embedded halfway into the concrete. The largest stone size should not exceed the thickness of the structure. 

The distance between stones is 4–6 cm. If the concrete slump is 5–7 cm, the masonry is vibrated; if 8–12 cm, it is tamped. 

Brick masonry 

The thickness of a brick wall is always a multiple of half-brick lengths: 0.5, 1, 1.5, 2, 2.5, 3, 3.5 bricks; partitions use a ¼ brick thickness (i.e., brick set on edge). 

Walls are laid using either a single-row (chain) bonding system or a multi-row (five-row) bonding system for joints, while columns and narrow piers (up to 1 m) use a three-row bonding system. 

Horizontal joint thickness is 12 mm, and vertical joints are 10 mm, with an allowable range of no more than 15 mm and no less than 8 mm. 

A single-row (chain) bonding system is created by alternating stretcher and header courses. 

In this system, transverse vertical joints are offset by a quarter brick, and longitudinal vertical joints are bonded by half a brick. This type of masonry is considered the standard for strength. 

Chain bonding of joints 

Advantages of the masonry: complete overlap of joints vertically, significant simplicity, and uniformity. 

Disadvantages: when laying corners and narrow wall sections, a lot of three-quarter bricks need to be cut; the laying should be done only in complete rows, with very little backfill. 

Chain bonding is recommended in winter conditions as it is more durable. 

Multi-Row (Five-Row) bonding system header rows occur every five stretcher rows

The crosswise vertical joints in header rows are offset by a quarter of a brick, while in stretcher rows, they are offset by half a brick. 

Longitudinal vertical joints (from the second to the sixth row inclusively) are not bonded.

Advantages: its strength is 94% of chain bonding, and the five-row system is less labor-intensive than chain bonding.

It also allows for significantly more backfill: for a wall thickness of two bricks, the volume of backfill is 42% compared to 25% in chain bonding. Less three-quarter bricks are needed for cutting at corners, and more half-bricks are utilized. 

The three-row bonding system for columns and narrow piers is formed by alternating three stretcher rows with one header row. 

In this system, the vertical transverse joints in three adjacent rows are not bonded. The strength is 97% of the chain bond. Header rows are primary, so they are always made from whole bricks. These rows are used to start and finish the masonry work, regardless of the bonding type, and are also laid under floor slabs, cornices, beams, wall plates, etc.

Cornices, arches, and chases masonry 

Openings are usually covered with reinforced concrete lintels. In low-rise buildings, openings up to 2 meters wide can be covered with reinforced brick flat, wedge, or segmental lintels, and up to 4 meters with brick arches. When constructing flat lintels, reinforcement bars are laid at 2 Ø 20 mm for each ½ brick on formwork made of 40-50 mm thick boards. A 2-3 cm layer of mortar is spread over the formwork, into which the reinforcement bars are embedded. 

Cornices. The overhang of each cornice masonry row should not exceed one-third of the brick’s length, with the total projection of an unreinforced brick cornice allowed up to no more than half the wall thickness. For greater projections, masonry is reinforced or laid on reinforced concrete cornice slabs anchored into the wall masonry. Temporary gaps in brick masonry along the height of longitudinal walls and the joining of interior walls to exterior walls are formed as sloping or vertical grooves. A vertical groove is reinforced with 3 bars of Ø 4 mm every 4 rows, or every 2 rows in winter. To increase masonry strength, it is reinforced by placing metal mesh in horizontal joints, with joint thickness no less than 4 mm greater than the sum of the diameters of intersecting reinforcement. If the reinforcement diameter exceeds 5 mm, the mesh is made in a zigzag pattern and placed in two adjacent rows. Masonry reinforcement meshes are arranged according to the project, but no less than every 5 rows.

For reinforced masonry, the mortar grade in dry conditions is accepted as no less than 25, and in wet conditions, it is no less than 50. 

Masonry of brick walls for lightweight structures. 

The walls of lightweight structures consist of two parallel brick walls made of half bricks, which are positioned at a distance determined by thermal calculations. The gap between them is filled with thermal insulation, lightweight concrete, or insert blocks. The outer walls are connected by brick or reinforced diaphragms. A “well” masonry technique can also be used, connecting the outer walls with vertical walls. Lightweight masonry is 40% lighter than conventional masonry but is more labor-intensive. It is used in low-rise construction or for the upper floors. 

Masonry with ceramic stones 

Masonry with hollow ceramic stones is widely used to improve the thermal insulation properties of walls, allowing for a reduction in thickness compared to standard brick walls. The masonry is mainly carried out using a chain bond system.

When laying, the outer wythe is first constructed, followed by the infill, and only then the inner wythe. Hollow ceramic stones should not be used in foundations, plinths, or the outer walls of wet and damp areas.

Мasonry with small blocks

Stones can be solid, with non-through and through voids. 

The grades of stones are: 25, 35, 50, 75, 100, 125, 150, 200. 

In the masonry made of solid stones, vertical transverse joints must be tied with header rows at least every third row. Concrete stones with non-through voids are laid with the holes facing down. When laying stones with through voids, the latter, if specified in the project, are filled with dry materials and compacted layer by layer with tamping. This type of masonry is often used with facing. 

Tessellated masonry. 

Tessellated masonry is the laying of natural stones of regular shape (granite, gabbro, marble, etc.) with a face surface treated “under a fur coat,” ground, or polished.

Tessellated masonry is used to clad stone or concrete surfaces to protect them from external influences and to give a sense of monumentality to a specific part of a building or structure. The stones are connected to the main masonry with wire: galvanized, copper, or bimetallic.

Inventory and tools for masonry work.

Scaffolding and staging are devices used to change the working height of a mason. The productivity of the mason varies depending on the height of the masonry. The highest productivity is achieved when working at a height of 0.6 to 0.9 meters from the floor. If the masonry is constructed with a ceiling and is no more than 5 meters high, staging is used; if it is higher, scaffolding is used. 

Several types of staging are employed in masonry work: hinged staging, lever staging, and block (panel) staging (envelopes). 

Scaffolding: Boltless tubular scaffolding consists of vertical posts and horizontal beams in two directions, forming a spatially rigid system. 

The maximum height is 40 meters. They are secured vertically every 4 meters and horizontally every 25 to 30 meters. 

Suspended string scaffolding is hung from brackets attached to the building frame and is used for constructing the walls of frame buildings. Staging and scaffolding of any design are installed in such a way that a gap of 50 mm remains between the decking and the wall for quality control of the surface of the structure.

Transportation of materials.

Bricks, ceramic stones, and small blocks are typically delivered to the site on inventory pallets. Bricks are laid in a herringbone pattern or with staggered bonding. Ceramic stones and small blocks are also laid with bonding. To avoid the risk of falling bricks, pallets are lifted to the work site using grabs with enclosures, boxes, or containers.

Mortar can be delivered to the construction site either ready-made or in the form of a dry mix. Mortar is transported to the work area in turning buckets, mason boxes, hoppers, or using mortar pumps (concrete pumps). At the site, fresh mortar is prepared from dry mixes. The use of dry mixes is particularly effective for remote projects.

Tools and equipment 

I. Productive tools: combined trowel, mortar shovel, hammer-chisel, jointing tool.


II. Control and measuring instruments: plumb bob, universal level, tape measure, folding meter, square, duralumin rule, 2-3 mm docking cord, docking ladder with hook, docking hook. 

Production of masonry.

It is rational to perform brick masonry simultaneously with the installation of prefabricated structures (floor panels, partitions, stair flights and landings, sanitary cabins, balcony slabs, window and door blocks, etc.). The height of freely standing walls is limited depending on the bulk weight of the masonry and the calculated wind load on it. When constructing walls as a whole, the building is divided into two zones of capture. In one zone, masonry is carried out, and in the other, the installation of structures takes place. Alternatively, a three-shift work schedule can be organized: the first shift for masonry, the second shift for installation, and the third shift for preparing materials. In such cases, it is rational to have a comprehensive crew (masons, installers, carpenters, riggers).

The erection of masonry as a complex process requires dividing the entire building into zones of equal labor intensity. There are single-zone, double-zone, and triple-zone systems. The fewer the zones, the more workers and shifts are required (but the construction time is reduced). In terms of height, the masonry is divided into tiers (usually to complete a tier within a shift or half a floor). Typically, with a floor height of 3.3 to 3.5 meters, it is divided into three tiers, and for 2.5 to 2.7 meters, into two tiers. The crew is divided into sections, and each section is assigned a plot of work.

The plots can range from 15 to 50 meters, depending on the thickness of the masonry and the crew of masons.

Brick is laid on mortar in the following ways:

  • in flush (with empty joints),
  • in flush with the cutting of mortar (for jointing),
  • in tight (with stiff mortar),
  • in half-flush on mortar (the inner part of the wall – infill).

Organization of the mason’s workplace

The mason’s workplace is defined as the space within which the construction being erected is located, where the workers engaged in masonry move, and where the necessary materials, tools, and equipment for the masonry are placed. The workplace should be accessible by a crane and consists of three zones: working, materials, and transportation.

The masonry is conducted using a flow-sectional method with the following crew configurations:

– “Pair” (1 mason, 1 helper) – for columns, pilasters, and partitions;

– “Trio” (1 mason, 2 helpers) – for solid walls, 2 bricks thick with chain bonding, or 1.5 bricks thick with multi-row bonding;

– “Quartet” (2 masons, 2 helpers) – for wall thickness up to 3 bricks and a small number of openings;

– “Quintet” (2 masons, 3 helpers) – for wall thickness up to 3.5 bricks and a medium number of openings;

– “Sextet” (2 masons, 4 helpers) (two “trio” crews) – for wall thickness of 3.5 bricks and more, with a large volume;

– “Nonet” (3 masons, 6 helpers) (three “trio” crews) – for wall thickness of 3.5 bricks and more, with a large volume and a significant number of openings.

Features of fireproof masonry 

For masonry, fireproof products are used: chamotte, dinas, magnesite, chromite, high-alumina, and refractory materials, among others. The thickness of the joints in fireproof masonry depends on the temperature regime: the higher the temperature, the thinner the joints should be.

Bricks are sorted by grades, and when the joint thickness is up to 1 mm, they are sorted by thickness and length.

Masonry is categorized by joint thickness:

– Category I – joint thickness of no more than 1 mm;

– Category II – joint thickness of 2 mm;

– Category III – joint thickness of 3 mm;

– Category IV – joint thickness of 3-4 mm.

In non-categorized, particularly critical masonry, the joint thickness is less than 0.5 mm. 

The masonry is carried out using special refractory mortars. 

Binders include cement, sand clays, and refractory clays. 

The filler is a powder made from the same material as the fireproof products.

Masonry should be conducted at a temperature of no less than +5°C and should be kept warm until fully dry.

Masonry in winter conditions.

Masonry can be performed depending on local conditions using the following methods:

  • Freezing;
  • Freezing followed by artificial partial or complete thawing;
  • Use of electric and steam heating for individual structures;
  • Using fast-setting mortars;
  • Freezing with the use of anti-freezing additives;
  • In heated greenhouses.

The project for winter masonry production should specify:

– The maximum allowable heights of walls and columns during the thawing period;

– Methods for increasing strength (brick or mortar of a higher grade, additional reinforcement of the masonry, etc.);

– Temporary support for individual unstable structures during the thawing period.

The production of work using freezing is not much different from summer masonry, but the hardening of the masonry differs significantly. The strength of winter masonry after freezing is very high, but it depends not on the grade of the mortar, but on the water content and the magnitude of the negative temperature. During thawing, the mortar in the masonry transitions from a solid to a fluid state, leading to a sharp decrease in the strength of the masonry, reaching its lowest value known as critical strength. Thawing periods of less than a day do not affect the thawing of the masonry, while thawing periods exceeding a day, especially at a masonry temperature of -2°C, begin to cause settling of the masonry. A thaw lasting 2 to 3 days with temperatures between 2 to 3°C can lead to complete thawing of the masonry and cause significant settling and dangerous deformations. Settling can be large and uneven, which is more dangerous than a reduction in strength. The average calculated settling for winter masonry is accepted as follows: for rubble masonry, 1-2 mm; for brick and concrete block masonry, 0.5-1 mm per meter of wall height. Therefore, a gap should be left between the masonry and the door or window frame. During the thawing of the masonry, it is necessary to: 

– Monitor the thawing and settling of the masonry;

– Control the hardening of the mortar in the masonry joints;

– In case of deformation, observe its development.

In the first few days, when the mortar has not yet set, deformed masonry can be corrected within the first 2-5 days. The masonry is adjusted using pressure braces, struts with ties, and wedges; in serious cases, steel cables are used, tightened with pulleys and winches. The strength and stability of masonry performed using the freezing method should be verified through calculations. During construction, a series of structural and production measures must be implemented to ensure the stability of the masonry: 

– In the corners and intersections of walls, ties made of strip or 12-14 mm round steel with anchors should be installed;

– After each floor, a ceiling should be laid with anchoring to the walls;

– Walls should be secured with braces and struts;

– For beams longer than 2.5 meters, supports should be provided (removed 10 days after thawing);

– Whitewash the wall facing the sun;

– Do not leave horizontal grooves (seal them dry);

– Water the walls.

Ensuring the stability of structures during the thawing period should be specified in the work production project.

Artificial thawing (by 0.4-0.5 thickness of the wall) through heating from inside the building protects the masonry from settling in the spring and significantly increases the load-bearing capacity of the wall and the spatial stiffness of the building during this period. Such thawing of the masonry may be required:

– When constructing buildings that do not allow for subsequent settling of the masonry;

– In bearing brick walls and solid monolithic reinforced concrete ceilings, supported around the perimeter on these walls and internally on permanent-height reinforced concrete or metal columns;

– To provide stability to freestanding structures and buildings (hollow brick columns, chimneys, etc.) and to enhance the stability of the walls of multi-story buildings during spring thawing.

Causes of accidents and damage to masonry.

– Incorrect support of reinforced concrete lintels;

– The anchor bolt fastening the cornice reinforced concrete slab enters the joint;

– No flexible connections between the masonry and the framework;

– Load-bearing structures are supported on the header course instead of the stretcher course;

– Eccentricity when loading brick columns;

– Use of low-quality materials in masonry.

– Significant curvature of the walls during masonry;

– Insufficient wall thickness;

– Inaccuracy in the layout of building axes;

– Improper construction of support pads for load-bearing structures;

– Weakening of the masonry due to the creation of grooves, niches, or chases not specified in the project;

– Violation of masonry cutting rules (joint staggering), thickening of joints, and use of brick debris in infill;

– Reduction of masonry cross-section due to increased voids;

– Performing winter masonry according to a project designed for summer conditions;

– Incorrect installation of temporary supports for structures;

– Errors during the heating of the masonry.

During the masonry construction process, the correctness of the joint staggering and their thickness, as well as the verticality, horizontality, and straightness of surfaces and corners, are controlled. During masonry work, the acceptance of hidden work should be carried out through acts prepared by representatives of the contractor and the technical supervision of the client, and the acceptance of hidden work is performed before the start of subsequent work.

The following works are subject to intermediate acceptance:

– Waterproofing of structures;

– Installed reinforcement meshes;

– Sections of masonry at the points of support for trusses, beams, and lintels;

– Installation of embedded parts;

– Securing cornices and balconies;

– Creation of expansion joints;

– Protection against corrosion of steel elements and embedded parts embedded in the masonry;

– Sealing the ends of beams and lintels in walls and columns;

– Support of ceiling slabs on walls;

– Anchoring of ceiling slabs.

Deviations in the dimensions and position of masonry structures from the project must not exceed permissible limits. For instance, the deviation of surfaces and corners of the masonry from vertical should not exceed 10 mm per floor and 30 mm for the entire height of the building. The deviation of masonry rows from horizontal over a length of 10 m should not be more than 20 mm. Unevenness on the surface of walls, detected using a 2 m long ruler, should not exceed 10 mm for plastered surfaces and 5 mm for unplastered surfaces. If deviations from project dimensions are detected, as well as in the case of increased deviations compared to permissible limits, the masonry must be dismantled and rebuilt.

Earthworks.

Earthworks are classified as the zero cycle of construction. They include the dismantling of old foundations, cleaning and preparing the site, cutting soil, uprooting stumps, felling trees, leveling the terrain, loosening the soil, removing earth, excavating trenches/pits, and more. The volume of earthworks depends on the terrain of the site and the type of foundation. Earthworks are categorized into the following types: open, underwater, and underground. Such works represent the excavation of soil or the addition of fill soil. In the first case, the excavation of soil, which is dug solely for extraction, is called a reserve, while the addition of soil is referred to as a dump or a cavalier. Consequently, the main objective of earthworks is defined as the creation of engineering structures from soil.

Earthworks include:

  • Uprooting stumps;
  • Leveling the terrain of the site (removing soil, adding soil to create a uniform level) – land grading for improvement or for construction;
  • Digging the ground to create a well, build a foundation, or lay or repair utilities;
  • Excavating pits;
  • Excavating artificial water bodies;
  • Preparing soil for drainage systems;
  • Driving piles;
  • Constructing channels and trenches, platforms for various purposes;
  • Creating foundations for structures and buildings;
  • Compacting the walls of pits and trenches;
  • Drilling and loosening the soil;
  • Dismantling old foundations;
  • Removing soil;
  • Laying roads (including temporary ones);
  • Compacting the banks of water bodies;
  • Laying utilities underwater.

Installation of prefabricated load-bearing and enclosing structures.

The installation of enclosing structures is a phased assembly of a metal frame using the latest technologies and in compliance with current safety standards. The installation of metal structures allows for the construction of entire complexes in the shortest possible time. 

Enclosing metal structures are designed to isolate interior spaces in buildings, taking into account regulatory requirements for thermal insulation, sound insulation, waterproofing, vapor barrier, air permeability, light transmission, strength, and more.

The main type of enclosing wall structures is sandwich panels.

Sandwich panels used in modern frame construction are attached to the elements of the load-bearing frame—beams (vertical installation of factory-assembled sandwich panels) or columns (horizontal installation of facade panels). 

Sandwich panels are a three-layer building product that typically consists of two sheets of galvanized painted steel and a filler material between them. They possess good aesthetic properties and excellent energy-saving characteristics. Sandwich panels are quickly installed, making them widely used in the construction of commercial and office buildings, industrial facilities, agricultural structures, and rapidly erected frame buildings.

Depending on their purpose, sandwich panels are divided into wall and roof panels. When choosing wall panels, the main parameters are strength, thermal conductivity, and fire resistance characteristics. For roof sandwich panels, durability should also be considered.

Roof sandwich panels must provide the necessary strength and complete airtightness of the roof, so it is recommended to use panels with a special profiling of the outer sheathing in the form of ridges. 

The energy-saving properties of sandwich panels are determined by the type of filler, the tightness of the joint, and the presence of a sealant within it.

Based on sandwich panels, three types of facade systems can be identified:

  • Sandwich panel of staged assembly using a wall cassette (the basis of the modular sandwich panel is a self-supporting wall cassette to which the external enclosing element is attached).
  • Sandwich panel of staged assembly using beams (wall beams are used, which are clad with profiled sheeting on the outer and inner sides, and an insulating layer of wool is installed within the beam).
  • Factory-made sandwich panel (a three-layer facade sandwich panel consists of an inner and outer layer of metal). 

All these options for wall sandwich panels have both advantages and disadvantages in comparison to each other, so the choice of a structural solution for a specific project is determined by the design documentation. 

The installation of lightweight enclosing structures is one of the stages of construction for buildings of various purposes: residential buildings, administrative institutions, and public facilities. Such products perform the following tasks:

  • They delineate the space within the structures and are used for zoning.
  • They enclose the open area adjacent to the building.
  • They protect the interior space from external influences.

The products are characterized by high strength, wear resistance, and a long service life.

Types and features of enclosing structures and their installation.

Varieties of structures:

  • Enclosures made of metal panels.
  • Walls made of sandwich panels.
  • Walls and ceilings designed for the construction of frame structures.
  • Door openings and window systems.
  • Roofing.
  • Suspended ventilated facades.

A common type of ceilings consists of a frame and panels. The frame serves as the base to which panels made of profiled tempered glass, sandwich panels, asbestos-cement extruded plates, and other materials are attached.

Such partitions are lighter than reinforced concrete and brick products, yet they are quite durable.

 During installation, materials resistant to high temperatures and moisture are used, meeting the requirements for sound and thermal insulation. 

Note: Partitions of this type are classified as quick-erecting, which simplifies the construction process without compromising the quality of the building itself.

Roofing works.

Roofing works are a mandatory type of work during the construction, major renovation, and reconstruction of a building. They involve the installation of the building’s roof with covering made of sheet, individual, rolled, and mastic materials. The key function of the roof is to protect the interiors from precipitation, sunlight, and other natural influences.

The key function of the roof is to protect the house from natural elements, ensure thermal and sound insulation, and provide fire safety. Therefore, strict adherence to technology during roof installation is essential. Otherwise, the structure may lose its airtightness—cold and leaks can lead to premature deterioration of building elements and damage to interior finishes. Let’s discuss the arrangement and materials for roofs of private homes that will help maintain comfort.

The type of roofing is determined by the client at the project stage. The choice of its configuration depends on the purpose of the building, climatic conditions, speed, and cost of construction.

The main types of pitched roofs are: mono-pitched, gable, hipped, tent, half-hipped, multiple-gable, vaulted, and domed roofs. The simplest and quickest to construct is the mono-pitched roof. It is most often installed on utility buildings and garages, as it requires the least amount of building materials for its construction.

A gable roof of classic shape is also a popular option due to its quick and easy installation, cost-effectiveness, and durability: it features two slopes and two gables. It can be supplemented with an attic or loft.

The four-pitched (hipped) roof is ideal for large square and polygonal houses. Practical and stable, this design can withstand mechanical and high wind loads. It also allows for the construction of an attic.

Other configurations—half-hipped, pyramidal, and multiple-gable roofs shaped like the letters “T,” “P,” or “G”—are rarely encountered as they require special construction skills. Not everywhere are there craftsmen with the necessary level of professionalism.

Main elements of the roof.

Despite the differences, the aforementioned types of roofs share a standard set of components. The diagram of their arrangement is presented below. The optimal dimensions of the lumber for these elements are:

  • Mauerlat – the foundation of the structure and the place where the roof is attached to the building. It is a massive square or rectangular beam on which the rafters rest. Its main function is to evenly distribute the load on the building’s walls. The standard section size is 150×150 mm.
  • -Ridge beam (ridge) – a crossbar located at the top of the roof. The upper ends of the rafters are attached to it. The size is usually 50×200 mm.
  • Rafters – the main elements of the rafter system. Lumber with a section of 50×150 mm is suitable for small outbuildings, while beams of 50×200 mm are used for residential roofs.
  • Posts – elements that support the ridge. Materials of two sizes are used: 100×100 mm or 100×150 mm.
  • Battens – a covering for laying the roof. For its creation, a batten with a size of 50×50 mm or a lathing board with a section of 20×150 mm is chosen.
  • Braces, tie beams, purlins – additional structural elements. Their sizes are 50×100 mm

 or 100×150 mm.

Stages of roof construction by SVT Group

The installation begins with preparatory work: a well-thought-out project allows for a detailed estimate. However, the list of necessary materials will include not only the roofing material but also elements of the load-bearing structure, the so-called roofing cake, and the drainage system. Before construction, the wood must be treated with a preservative that will reduce its flammability and protect it from pests and moisture.

Necessary roofing materials:

  • Insulation;
  • Vapor barrier;
  • Waterproofing;
  • Roofing material;
  • Self-tapping screws, nails, profiles.

The stages of assembling the “roof cake” carried out by SVT Group.

  1. I. Installation of the mauerlat. The beam is connected to the reinforcement frame using anchor bolts.  
  2. II. Installation of the rafter system – the load-bearing structure of the roof. The rafter legs are attached to the mauerlat with corner profiles and wood screws. The structure is additionally reinforced with long nails. The number of beams depends on the configuration and size of the building, as well as the climatic conditions.  
  3. III. Insulation. The insulation protects the house from heat loss. Basalt wool or polystyrene boards are laid inside between the rafters. The joints are sealed with moisture-resistant adhesive tape.  
  4. IV. Waterproofing. The hydrophobic membrane protects the structure from leaks during rain and snowmelt. It is secured outside over the entire area of the rafters. The layer is laid from the eaves to the ridge. Care should be taken to avoid overlapping the material over the ridge to not impair roof ventilation. The membrane is pressed down with counter battens.  
  5. V. Vapor barrier. This membrane protects the insulation and the entire wooden structure from moisture exposure. It is secured before the insulation on the inside of the room. The vapor barrier ensures the necessary humidity levels in the house – this affects the lifespan of the interior finishes.  
  6. VI. Counter-batten. Creates a ventilation space between the waterproofing and roofing material, and also protects the insulation from damage due to condensate formation. It is installed over the waterproofing along the rafter legs perpendicular to the ridge.  
  7. VII. Battens. Strengthens the spatial structure of the roof, provides rigid fixation of the roofing material, and protects it from deformation. It is installed on the rafters with screws or nails. The spacing of the beams depends on the type of subsequent flooring.  
  8. VIII. Laying the covering. The final stage of work. The choice of covering depends on the configuration of the roof.

       The materials for a flat roof include:

  • rolled: roofing felt, pergamin, tar, polymer film;
  • mastic: polymer-bitumen mastic, polyurea, polyurethane – poured directly onto concrete.

       The materials for pitched roofs include:

  • sheet: ondulin, corrugated sheet, slate, standing seam;
  • modular: tiles, slate.

The construction of the roof requires strict adherence to installation rules at every stage – this way, the structure will last long, keeping the heat inside and pleasing to the eye.

Waterproofing works.

Waterproofing works involve eliminating active leaks in hydraulic structures, underground buildings, tunnels, restoring cutoff waterproofing, installing drainage systems, deformation and temperature joints, and applying waterproofing using injection technologies. The waterproofing works carried out by SVT Group are one of the most important stages in the construction and repair of structures, buildings, and facilities. High-quality moisture protection for all elements ensures the durability and reliability of the objects. Our company has experienced specialists in the field of waterproofing works.

Waterproofing ensures the normal operation of buildings, structures, and equipment, increasing their reliability and longevity. Waterproofing works are carried out using special materials that protect buildings and structures from the harmful and destructive effects of water. Waterproofing of concrete structures, waterproofing of concrete constructions, waterproofing of concrete.

Waterproofing materials used include:

  • Metal sheets;
  • Roll and sheet materials (such as geosynthetics or PVC membranes, films);
  • Liquid-applied materials (such as liquid rubber, spray-applied cork coating);
  • Mineral binding materials;
  • Materials based on bentonite clays;
  • Dry construction mixtures with penetrating action (penetrating waterproofing).

There is a vast array of waterproofing materials, which can be divided into several types in our product line: polymer-cement coatings, liquid-applied materials, injection waterproofing materials, and so on. Injection materials are represented in our range as single-component or two-component materials based on polyurethane resins. These materials are typically used in existing buildings and structures where the existing waterproofing is ineffective or has simply ceased to exist over time. Replacing the external waterproofing layer in buried sections of structures, such as building foundations, road tunnels, subways, tanks, and reservoirs, is often only possible by using injection waterproofing.

Floor installation 

The floor is the most heavily used surface in any room. For this reason, special attention should be paid to the installation process. To ensure that the flooring lasts as long as possible, it must be properly installed. The floor is a complex system consisting of several layers, each of which performs a specific function and includes various materials. The necessity of having a particular layer depends on the type (tiled, wooden, cement, poured polymer, concrete) and purpose of the floor.

The flooring installation includes the following layers:

Foundation. The installation of any type of flooring requires a load-bearing base. In private houses, on plots, or in basements, this surface is the ground, which is first carefully compacted. Debris, organic material, and frozen soil, as well as snow and ice, are removed, and the surface is covered with sand backfill. In cases where groundwater is close, additional drainage measures are taken before installing the flooring. In multi-story buildings, the foundation is the plinth, basement, or inter-floor slab.

Sub-base layer. This part allows for even distribution of the load across the entire perimeter of the ground foundation. The sub-base layer can be rigid (made of cement or acid-resistant concrete) or non-rigid (made of slag, gravel, sand, crushed stone, clay concrete, and others). Its thickness is determined based on the material and the anticipated loads during construction and subsequent operation of the premises. For industrial flooring, reinforced concrete, gravel, sand, expanded clay, and other bulk materials are used as the sub-base layer.

Waterproofing. This layer is designed to protect against the rise of groundwater or wastewater, as well as moisture penetrating from adjacent premises. The installation of waterproofing is mandatory when groundwater is located closer than 2 meters from the foundation. This part of the floor must be airtight across the entire surface and should only be laid on a flat, stable surface. Materials such as roofing felt, hydroisol, polyisobutylene, bitumen, and latex mastics are used to create this layer. Depending on the purpose, the waterproofing can be placed above or below the screed. If necessary, the sub-base and waterproofing layers can be combined with gravel impregnated with bitumen or tar. Waterproofing is an essential component of the floor construction with wooden covering.

Sound insulation. This layer is laid when there is a need to protect against the intrusion of impact noise into the premises. Materials such as lightweight concrete, calcined sand, and special elastic pads are used for sound insulation, which cover the junctions of the floor with the walls and the joints of the ceilings.

Thermal insulation. This layer allows for maximum heat retention and reduces the overall thermal conductivity of the floor. Materials such as foam plastic, gas silicate slabs, as well as expanded clay or lightweight concrete are used for thermal insulation, which must be covered with a leveling screed. Typically, this layer is included in the construction of floors located in rooms above basements.

Screed. This part serves to level and provide rigidity to the bearing foundation or the surface of the lower layers. The screed allows for even distribution of the load on the flooring. If necessary, it can create a specific slope (for water drainage in a utility room or bathroom). Additionally, this layer can be used to conceal wires and pipes (for example, when laying underfloor heating). The screed is made from cement-sand mixtures or concrete. It is also possible to prepare this layer from prefabricated boards such as particleboard, fiberboard, OSB, gypsum fiberboard, or plywood. The choice of material depends on the type of final surface finish.

Interlayer. This part connects the lower layers with the finishing covering. The interlayer can be made from various adhesives, mastics, putties, special mixtures, or concrete. When using parquet boards or laminate, this part is made from a polymer underlayment.

Finishing covering. This layer is the final one in the flooring installation and bears the main load. Therefore, when choosing the flooring material, it is essential to consider the operating conditions of the room. The surface covering can be made from various finishing materials: parquet, laminate, tiles, linoleum, carpeting, poured polymer compositions, and others. The choice of finishing materials depends on the purpose of the room. Linoleum, parquet, board coverings, and floors made of polymer materials are laid in apartments, houses, and offices. Ceramic tiles are used in bathrooms and kitchens. Coverings made of fiberboard, particleboard, and plywood are laid in utility rooms.

Among the most popular types of coverings, the following can be highlighted:

  • wooden floors;
  • linoleum;
  • laminate;
  • parquet board;
  • tiles;
  • poured floor.

With the wide prevalence of wooden floors and their undeniable environmental friendliness, it is important to note that wood requires a specific temperature and humidity regime. The same applies to parquet flooring, which is beautiful but incredibly expensive and temperamental.

A compromise option—both in terms of cost and quality—is laminate. However, when laying it, serious attention must be paid to the perfect evenness of the surface; otherwise, your floor may warp. Laminate also does not tolerate excessive moisture.

Linoleum is perhaps the most democratic covering: relatively inexpensive, easy to clean, and durable. However, any unevenness in the base will negate its integrity. In addition, linoleum can be easily dented, for example, by heavy furniture. Inexpensive samples do not withstand temperature fluctuations, and many find them aesthetically unpleasing: they look cheap.

Tiles are a sensible option for zoned coverage (bathroom, toilet, hallways).

Poured floors are a relatively new covering option. Most often, these floors are installed in high-load areas. They are durable, safe, and aesthetically pleasing.

Advantages of poured concrete floors 

Poured concrete floors are becoming increasingly popular as this option meets all the main requirements for safety and comfort.

The main advantage of poured floors is their durability. Manufacturers usually provide a warranty for such coverings for 10-20 years, but in reality, this period can be extended to at least double that.

Poured floors are safe coverings. They are characterized by increased moisture resistance, are not afraid of fires, and can withstand aggressive chemicals. Temperature fluctuations will also not be an unpleasant surprise for owners of poured floors.

Poured floors are quite aesthetically pleasing; moreover, due to the variety of colors and designs, they fit into almost any interior.

Poured coverings require no special maintenance: all stains are very easy to remove, and cleanliness can be easily maintained in homes, offices, workshops, and warehouses.

The only drawback of poured floors can be considered the rather labor-intensive preparation of the base and the high cost of work. By turning to professionals, you will not only significantly reduce the time required for installing the floor but also ensure its quality, safety, and aesthetics—experts will help you choose the optimal type of poured floor within your allocated budget that meets the conditions of use. Additionally, the durability and unparalleled strength of the finished covering will allow you to save significantly on its repair and replacement in the future!

Glazing

Glazing of building facades is a stylish, increasingly popular trend that has a distinctive feature compared to standard glazing. From the outside, glazed facades look elegant and “airy,” while inside such spaces are filled with natural daylight from the windows. Today, it is possible to glaze facades with large glass packages in various ways, depending on the purpose and height of the building, the aesthetic preferences of the client, and other factors. In each specific case, the type of facade glazing is chosen that best fits the type and purpose of the building.

Modern facade glazing for any purpose:

  • for offices and business centers
  • for restaurants, bars, and cafes
  • for houses, cottages, and apartments
  • for shops and shopping and entertainment centers
  • for banks and financial institutions
  • for manufacturing enterprises
  • for educational centers and institutions
  • for beauty salons and medical centers

Facade glazing is divided into two main types: cold and warm. By the method of fastening, it can be structural or semi-structural, stained glass, spider, or modular. The stick-and-mullion system of open or semi-open type is also popular.

What are the differences between “warm” and “cold” facades?

If you want the interior of a building with transparent walls to be warm and comfortable, you will need warm facade glazing. For this, the following is used:

a wide PVC profile of 60-100 mm filled with double or triple-chamber glass units; an aluminum frame, which must include a polyamide insert (thermal break).

Each system must have two sealing contours for increased protection against freezing and drafts.

When thermal insulation performance can be neglected, it is advisable to order “cold” facades. They are based on aluminum structures only 50 mm wide, with fewer chambers and sealing contours. The systems are airtight, protecting against precipitation and dust. They maintain an indoor temperature of +12/+14° C even during frosty weather at -20/-22° C. Additionally, they are significantly lighter and cheaper than PVC structures.

Methods of forming facades with glass panels

Thanks to the use of flat and curved glass, cladding projects are created for both flat and radial facades, as well as corner structures. The facade glazing is planned in one of the following ways:

Structural and semi-structural

The base is an aluminum frame covered with glass. In the structural method, the glass units are fixed using a special adhesive sealant, which securely holds them in place and eliminates shifting. There are no protruding elements on the front side, allowing designers to achieve the maximum aesthetic effect. In the case of the semi-structural method, transparent or tinted panels are fixed with glazing beads.

Stained glass

The cladding is secured using lower and upper clamping profiles. There are no additional elements on the exterior, creating the effect of continuous glazing. Such facades are used in custom projects with a particular emphasis on ultra-modern design. Very often, owners of entertainment complexes, shopping, and business centers order stained glass glazing. This additionally attracts the attention of potential visitors and investors to the building.

Spider-type

There are no profiles here—only transparent panels and point fasteners of the spider type. You will not find bulky frames on the outside or inside, appreciating the lightness of the structure itself. A feature of this type of facade glazing is the absence of movable sashes. However, the abundance of light and properly designed ventilation systems compensate for this drawback.

Stick-and-mullion 

It is considered a classic method of designing facades. It consists of a system of vertical posts and horizontal rails. 

This framework is filled with single panels or double-glazed units, depending on the level of energy savings you wish to achieve. It is complemented by clamps on screw fasteners to prevent shifting. It can be attached in two ways: to projecting elements of the building or to a pre-constructed framework.

Framed and frameless structures

We offer projects with framed and frameless facade glazing. For this, we use a durable profile made of anodized aluminum and reliable steel fasteners. We fill wide panoramic openings and non-standard gaps with transparent panels. We always check the allowable load limits for the selected structures.

We clad low-rise and high-rise buildings using the services of industrial climbers. A variety of glazing options are available: transparent, tinted, colored (film-coated or mass-colored), and mirrored.

Finishing works

Finishing works are the final stage of construction or renovation of a building or structure being put into operation. They are carried out to protect the building’s structures from the effects of the external environment, create comfortable living conditions, and give the house a completed appearance. The main finishing works include cladding, plastering, painting, wallpapering, and flooring.

Finishing works include: 

  • plastering works; 
  • cladding works; 
  • tiling works; 
  • painting works; 
  • varnishing works; 
  • wallpapering works; 
  • decorative works; 
  • fresco works; 
  • electrical and plumbing works; 
  • carpentry works; 
  • flooring installation; 
  • window installation; 
  • dismantling of old floors, coverings, structures; 
  • ceiling, door installation, etc. 

Rental and services of specialized equipment

Rental of equipment for construction tasks. Specialized equipment services with experienced operators. We provide the following types of specialized equipment:

  • Excavators 
  • Cranes and lifts 
  • Bulldozers 
  • Concrete pumps 
  • Hydraulic hammers 
  • Graders 
  • Loaders 
  • Rollers 
  • Road milling machines 

Design and installation of solar panels.

SVT Group carries out the design, sale, and installation of solar batteries and power plants.

Solar power plants are relevant equipment in today’s world. Some seek to order the design of solar power plants to feel comfortable during emergency outages and gain autonomy, while others hope to benefit from the “green tariff.”

Solar power plants can be divided into two types:  

  • commercial stations;  
  • stations for private households.

The difference between these solar power plants lies in their purpose. Commercial stations are designed for business and involve installing solar panels on the ground or on the roofs of industrial buildings to generate profit. Owners of commercial stations sell electricity generated from solar energy to the government.

Requirements for solar power plant design

The main requirement for a company engaged in designing a solar power plant is to base the project on the technical specifications. Therefore, before attending a consultation, decide which criterion is your priority. There may be several starting points:

  1. Power. Often, the priority is a specific output (in MW) that the solar power plant must achieve.
  2. Budget. If you have a limited budget, design engineers should select the best option within this financial scope.
  3. Land area. If you have a specific plot for solar panels, specialists will need to select equipment to ensure maximum productivity.
  4. Equipment. Your starting point may be solar panels or inverters from a specific brand you trust.

It is equally important to understand where the power generated by the station will be connected. Based on technical requirements, our specialists will provide a station design.

Demand for solar power plant design has grown significantly among private homeowners. Buying solar panels and installing them on a house independently is a poor idea, as it can lead to additional costs and system inefficiency without careful planning.

​ Stages of project development for private homeowners.

​Preparation of technical specifications.

Project planning always begins with setting technical specifications. The first step is to decide on the system type:

1. Solar power plants for the “green tariff” (grid-tied systems).

In this case, the first step is to understand the desired power output the customer wants from the solar power plant. If there is a limited free area, it’s essential to select the peak module power carefully.

For the “green tariff,” a grid-tied system is used. After determining the required power for the solar panels, specialists should select an inverter with the appropriate capacity.

The green tariff is a system that involves installing a special meter. This meter calculates the amount of electricity consumed (used when solar energy is insufficient, such as on cloudy days or at night) and the amount of electricity generated that was sent to the state power grid. At the end of each month, calculations are made. The difference between consumed and generated electricity converts into an amount that the homeowner either pays to or receives from the state.

The advantages of grid-tied systems include lower equipment and installation costs and durability, as components do not wear out over time.

A drawback is that when the city power supply is cut off, the system shuts down, making grid-tied systems unsuitable for rolling or emergency power outages.

2. Hybrid solar power stations with batteries.

​A hybrid solar station, like a grid-connected one, consists of solar panels and an inverter. However, an additional component, a battery system, is added to this scheme. To correctly design a solar power station, it is necessary to understand:

  • the level of electricity consumption by the household (based on this, the inverter will be selected);
  • the desired period of time for which the batteries should provide power to the house. 

For project development, engineers typically visit the site if all the details could not be clarified during the conversation with the client. 

The stage of setting the technical assignment takes the most time and effort during the project development.

Uninterruptible power supply systems (UPS)

If you need to provide backup power for your home or apartment to ensure important electrical devices function during emergency and rolling power outages, we recommend uninterruptible power supply systems. These systems consist of inverters made in the Netherlands, as well as high-capacity batteries. Some models are compatible with solar panels.

​Designing a monitoring system

Monitoring systems are usually connected to inverters. They allow the use of special apps for smart devices to view the key parameters of the solar power station’s operation.  

Sometimes the monitoring system is already integrated into the inverter, but other times additional equipment needs to be provided. Specialists can configure and connect the system if it is specified in the technical assignment.  

With monitoring in place, the company that installed the system can remotely assist the owner of the power station if an error occurs.  

Specialists can also adjust the equipment settings if needed.

​

What is included in project documentation

The project documentation includes several sections:

  • Technical specification;
  • Estimate, including the price of the selected equipment (agreed with the customer);
  • Annual production forecasting;
  • System design (with calculations for mounting methods, cable routing, circuit breaker selection);
  • Explanatory note;
  • Layout diagrams for solar modules, cable routing drawings, inverter equipment installation;
  • Single-line diagram for panel connection;
  • Cable log;
  • Materials list.

All these sections will contain comprehensive information about all stages of equipment installation at the site.  

To properly select the installation method and mounting points, it is necessary to consider where the photovoltaic modules will be installed:

  1. When installing equipment on the roof, it is important to understand its shape and the materials it is made of – this is a critical point for ensuring long and uninterrupted operation of the equipment. The roof must be strong and must not leak under any circumstances.  
  2. When installing on land, the soil should be considered, the drilling depth should be determined, and a diagram of the future foundation, which will be constructed, should be drawn.

Also, when installing a solar power station in a private household for personal use, it is often recommended to orient part of the solar panels to the West and part to the East. This way, the electricity generation will be more even throughout the day. For businesses, solar panels are often oriented to the South, installed at an angle of 35 degrees.  

After creating the correct technical assignment and agreeing on it with the client, it is necessary to select equipment (solar panels, inverter, batteries) that will match the calculated results.  

For proper installation of a solar power station, it is important to consider the presence of grounding on the site. If grounding is not present, specialists will take care of its organization. The “Rules for the Installation of Electrical Installations” recommend providing individual grounding for the station.  

The placement of solar panels plays a key role. Usually, they are installed on the roof for the simple reason of not occupying useful space.  

Whether it’s a ground-mounted installation or on the roof of the house, technical rules and a clear sequence of actions must be followed.

The main recommendations for the installation of modular photovoltaic panels:

First of all, it is necessary to design the solar power plant in the most illuminated area. Typically, this is the southern side of the roof, as in the Northern Hemisphere, the Sun always deviates to the south. Next, you need to plan the angle of inclination of the panels so that the rays fall on them at a right angle. Throughout the year, the position of the Sun changes; in winter, it is farther south, and in summer, it is closer to the zenith. All other characteristics affecting the efficiency of solar panels must be taken into account. If the structure is movable, it is recommended to change the tilt of the panels every 5-6 months: in winter, raise them by 10-15°, and closer to summer, lower them. If the structure is not adjustable, it is better to set the optimal angle at 33-34° relative to the ground. Keep in mind that the panels should be tilted relative to the ground surface, not the roof. If the roof is too steep or too shallow, a special frame is created to compensate for the tilt, aligning the angle relative to the ground.

The sharper the angle between the surface of the panel and the direction of the rays, the greater the losses. This can be easily understood by looking at the efficiency loss table:

Angle of solar ray incidence     Percentage of loss 

81° -1,2%

72° -4,9%

50° -19%

45° -29%

A small deviation of 5° from the optimal tilt angle will result in negligible efficiency losses, and such a discrepancy is acceptable. However, no more than that.

The placement of panels is often influenced by the geographical characteristics of the area, altitude, and landscape. Based on these factors, the optimal location is calculated.

When planning, ensure that there are no tall trees, poles, or structures near the sunny side. At certain times of the day, they will cast shadows on the photovoltaic modules, which will affect the entire system.

When one of the blocks is shaded, the overall voltage drops, causing the solar inverter to receive less electricity. To solve this problem, multiple MPPT trackers are needed to adjust the characteristics to the average voltage.

For example, if you have two blocks on your roof and one of them is less illuminated, to avoid losses, they should be connected to separate trackers. Independent blocks will work in their own mode, and the MPPT tracker will ensure maximum output.

Worse than that is partial shading of one or more panels. In this case, the MPPT tracker will react and reduce the input voltage to the inverter, causing electricity loss. When placing the panels, try to ensure that the entire block connected to one MPPT tracker is illuminated evenly.

The level of shading also plays a role. A cell that is completely shaded will stop working, while a partially shaded cell will generate electricity proportional to the level of shading.

In inverters in the mid-price range, there are models with a function to detect damaged areas of the panels. For example, if one of the cells stops working, a light signal will appear on the inverter’s body. This way, you will immediately know about the malfunction and can fix it faster, preventing the solar power station from losing output.

If you cannot avoid shading, plan the frame so that everything is illuminated evenly. This is done based on the number and installation location of the panels, as well as technical conditions.

A solar panel is quite heavy. A 275W panel weighs more than 18kg. A 10kW system consists of 36 such units. The total weight of the structure will be 655 kg.

To withstand such weight on the roof, a strong yet lightweight structure is required. It is usually made of aluminum profiles. The modules themselves are attached to steel brackets through mounting holes. Grounding is routed through these holes to the entire structure. Since this type of structure does not have supports and is directly mounted to beams and the roof, the weight is distributed evenly with greater stability and reliability than the ground-mounted version.

Frames for ground-mounted installations are made of wood or combined with aluminum beams. This results in a cheaper option but less durable due to the wood’s vulnerability to moisture. The frame is placed on supports made of galvanized steel or aluminum pipes, which are either buried in the ground or firmly set in concrete.

The main requirement is that the height from the ground to the panels should be at least 1 meter to prevent snow accumulation in winter.

To make the structure more stable, it is designed in length. The height is typically limited to two or three modules.

Another type of frame is a thick-walled support with a solar tracker. It is designed to bear heavy loads, but in practice, more than 6-8 modules are rarely placed on it.

What does professional panel installation include

Typically, solar panels are installed by specialists with experience and knowledge of how to do it correctly. The installation of solar panels includes a range of services:

First, an exact location is determined. Our company specialists gather the exact geographic coordinates of the house, the roof layout, and input this data into a program that uses satellite technology to determine which area receives the most sunlight. This is an industrial paid technology that is not available to regular installers.  

Based on the data received, our engineer creates diagrams and drawings for the project.  

According to the project, a custom frame is ordered with the optimal tilt, dimensions, shape, fastenings, etc.  

After manufacturing, metal beams are installed on the roof, solar cells are mounted on them, and then connected.  

A trial launch and testing of the power station are conducted.

The installation timeline depends on the complexity of the structure, the roof layout, the size, and other factors related to the choice of panels. Typically, the entire process takes from a few weeks to a couple of months, which includes project development, manufacturing the frame, and installation. In any case, it is faster and of better quality than self-installation.  

Without the necessary knowledge and skills, it is better not to risk the equipment with a DIY installation.  

The truth about DIY installation.

Technically, no one forbids you from installing metal beams, hanging the panels, and connecting them yourself. A license or permit is not required for this. However, in this case, there is a high probability of making a mistake during the connection, as photovoltaic modules are made from sensitive semiconductor components.  

If one of the cables is incorrectly connected, the power plant will not work, and in the worst case, something might break, which will not be covered under warranty, and you will not be able to get back the money spent.  

Heavy panels require a stable frame made according to the plans and assembled by experienced installers. If the frame is not strong enough, it may break under strong winds or accumulated snow. This is especially true for ground installations, where the back side will be exposed to wind gusts and snow drifts.  

The installation itself also requires extreme caution. A random impact or drop of the panel can at least reduce its performance or even completely disable it.  

Most importantly, the efficiency of the solar panels will clearly be lower because the calculations for tilt and optimal geographical direction will not be precise… most likely, they will be “by eye.” As a result, the output will be lower than the maximum achievable level in your technical conditions, and the payback period will be extended.  

Losses could be as high as 30%, which translates to about 300-400 kWh per year for each kilowatt of system capacity. You will lose much more than you would have paid for the installation. Given the average lifespan of 25 years, these expenses will fully pay off.

Landscaping.

Landscaping is a set of works aimed at creating comfortable conditions for people and improving the aesthetic appearance of an area. Every new building and structure requires landscaping. 

In every settlement, special attention should be paid to the landscaping of courtyard areas. To create an aesthetically pleasing and comfortable living environment, it is not enough to just carry out regular cleaning, remove construction waste, and dispose of household garbage. Proper landscaping will improve the appearance of the courtyard of a residential building or the area surrounding an industrial building. It will also help make the air cleaner, outdoor walks more enjoyable, relaxation more comfortable, sports activities more convenient, and children’s play in the playground safer and more engaging.

Landscaping stages of work 

Landscaping of industrial enterprises, courtyards, city squares, and streets includes the following tasks:

  • Land leveling using special machinery;
  • Stump removal, cleaning, and removal of construction debris;
  • Paving of paths, plazas, and sidewalks;
  • Creating recreation areas;
  • Developing sports and playgrounds;
  • Laying communications for irrigation and lighting systems;
  • Construction and installation of small architectural forms – gazebos, benches, sculptures;
  • Installation of stormwater drainage systems;
  • Construction of artificial ponds and fountains;
  • Installing streetlights and fences;
  • Landscaping – creating lawns, flowerbeds, planting plants and large trees, vertical gardening. 

The list of activities is quite extensive and varied, so the improvement of courtyard areas, streets, or industrial zones should be entrusted to specialized companies with extensive experience. Only professionals can perform the entire range of necessary activities efficiently and within a short time frame, starting with planning and ending with the removal of construction debris.  

A high-quality improvement project is the key to a successful result.  

It is important not to forget that before starting the improvement work, a series of preparatory steps need to be carried out. The quality of these preparatory activities will largely determine the final result.

The following tasks are performed during the preparatory stage:

  • Discussion with the client about the details of the design brief;
  • Assessment of the site location and its landscape;
  • Analysis of the ecological and climatic conditions of the site;
  • Site measurements, topographic and geodetic survey;
  • Mapping of existing vegetation and buildings;
  • Identification of factors that may hinder project implementation;
  • Soil analysis and determination of groundwater depth;
  • Preparation of plans for flowerbeds, utilities, paths, etc.;
  • Preparation of sketches and estimates, their approval with the client;
  • Preparation of a dendrological plan and a list of plants with quantities specified;
  • Development and preparation of all necessary project documentation. 

Creating a project is the foundation of all landscaping works. The main task of the designer is to give the area an attractive appearance, effectively divide it into functional zones, and ensure comfort and usability in any season and at night. It is important that the improved site blends harmoniously into the urban landscape, providing people with comfort and aesthetic pleasure. A well-thought-out project allows one to visualize how the site will look after the work is completed, determine the type and calculate the amount of necessary materials, their cost, deadlines, total labor costs, and expenses for implementation.  

We specialize in landscaping and improving the areas of industrial enterprises, city streets, and courtyards, as well as providing construction waste removal. Using modern technologies, qualified specialists from various fields, and a large fleet of vehicles and special equipment, we can successfully tackle tasks of any complexity and scale in a short amount of time. If you want a flawless result at a reasonable cost, trust your landscaping project to SVT Group!

Installation of metal structures

The installation of metal structures is a set of works related to the assembly and installation of load-bearing structures of buildings and structures made of metal elements.
Main stages of installation:

  • Preparation of the foundation and footings
  • Preparation of metal structures – marking, cutting, welding of individual elements
  • Transportation of structures to the installation site
  • Installation and alignment of structures
  • Welding and bolted connection of elements
  • Anti-corrosion protection of structures
  • The installation of metal structures is used in the construction of industrial and civil buildings. 

All work is carried out based on the approved project documentation, which must comply with the current standards.

The installation of metal structures is carried out

  • In the construction of new buildings for industrial, warehouse, and commercial purposes. Metal structures are often used for the frameworks of such buildings.
  • In the construction of large public facilities—shopping centers, sports complexes, exhibition pavilions. Metal allows for covering large spans.
  • In the reconstruction of buildings and factories in industrial enterprises. New technological equipment often requires reinforcement of existing structures.
  • In strengthening and increasing the load-bearing capacity of structural elements of operational buildings.
  • In the construction of various engineering structures—power line supports, telecommunications towers, pipeline overpasses.
  • In the construction of transport interchanges, bridges, overpasses. Metal is widely used in transport infrastructure.
  • In the reconstruction of historical buildings to reinforce structures without changing the facades. Typically, the installation of metal structures is required in the construction of large and technically complex objects.

The installation technology includes the following main stages:

  1. Preparation of the foundation and foundations. Checking compliance with the project, cleaning, and leveling.  
  2. Delivery of metal structures by road transport to the site. Unloading, storage in the installation area.  
  3. Incoming inspection of metal structures with verification of quality certificates.  
  4. Marking the installation locations for columns, crane beams, trusses, and other elements.  
  5. Installation of metal structures in the project position using a mounting crane. Leveling and temporary securing.  
  6. Permanent securing of elements by welding or bolted connections at the installation site.  
  7. Quality control of connections – visual and physical. Correction of defects.  
  8. Anti-corrosion protection of structures using primers and paints.  
  9. Geodetic control of installation accuracy.

Safety is of paramount importance, including the use of lifting equipment and the qualification of the installers.

Types of steel structure installation:

  • Installation of building frames – columns, girders, beams, trusses. Rolled profiles and pipes are used.
  • Installation of tanks, vessels, silos. Made from sheet steel.
  • Installation of supports, overpasses, bridges. Made from profile steel.
  • Installation of tubular structures – pipes, bends, transitions.
  • Installation of sheet structures – decking, cladding, enclosures.
  • Installation of masts, towers, and pylons. Made from profile or tubular steel.

Main materials 

  • Steel rolled profiles of different types.
  • Hot-rolled pipes, square and rectangular.
  • High-strength sheet steel.
  • High-strength bolt connections.
  • Stainless steel elements.
  • Special anti-corrosion materials. 

Recommendations for selecting optimal materials for the installation of metal structures: 

For load-bearing structures, it is recommended to use steel with a yield strength of at least 235 MPa. For critical buildings and structures, steel with up to 400 MPa is used. In aggressive environments, stainless or galvanized steel is effective. In areas with low temperatures, low-alloy steels are appropriate. For structures inside heated buildings, regular carbon steel is suitable. The choice of profiles (I-beams, channels, pipes, etc.) depends on the loads they will bear. Connection elements, such as bolts and studs, should match the strength of the steel used for the structures. For corrosion protection, polymer coatings applied in 2-3 layers are optimal. Materials must have all quality certificates. Proper material selection takes into account operating conditions, loads, and ensures the reliability of the structures throughout their entire service life.

Ventilation system installation 

Ventilation installation is the process of setting up and configuring an air exchange system, designed to provide fresh air intake and remove polluted air from the room. This ensures the necessary level of oxygen circulation. Performing this work requires knowledge of standards and requirements, as well as consideration of the specifics of the object. A properly designed and installed ventilation system ensures a healthy microclimate in homes and offices, influences technological processes in industrial buildings.

Ventilation is classified as one of the essential engineering systems in a building. It helps maintain optimal conditions in the building, improves air quality, and prevents the formation of condensation and mold in apartments, private country houses, production facilities (workshops), and public and administrative buildings (rooms).

  • The installation of supply and exhaust ventilation includes organizing two main flows: the intake of fresh air and the removal of exhausted air;
  • The importance of using silencers, filters, correct types of connections, thermal insulation and heating of air ducts, ventilation grilles, boxes, and diffusers;
  • Common mistakes during ventilation installation: incorrect calculations, equipment mismatch, incorrect installation location, insufficient insulation, cost-saving on the project and installation services. 

Types of ventilation systems 

Natural ventilation operates based on two principles: 

  1. Thermal buffering. Light warm air rises, while cold air descends. Wind creates different pressure levels. Air moves from areas of higher pressure to areas of lower pressure.
  2. In mechanical systems, fans are used for forced circulation. Air is supplied from the outside, cleaned of dust and contaminants using filters. It is heated or cooled and distributed throughout the building via ducts and ventilation openings. Used air is expelled outside the building. 

Components of a mechanical ventilation system:

  • Fans.
  • Filters.
  • Coolers and heaters.
  • Ducts.
  • Controllers and sensors.
  • Air heaters (calorifiers).
  • Forced ventilation is not dependent on natural factors (temperature, wind). 

Typology from a functional perspective: 

General ventilation serves to provide a healthy working environment. It removes pollutants, reduces temperature and humidity, and maintains air quality. 

Local ventilation systems remove harmful substances at their source. It consists of an intake device, ducts, and a fan. Extraction pipes and hoses remove pollutants from the source. Ventilation chambers and cabinets are used for working with hazardous substances in enclosed spaces. Ventilation tables are used in tasks where pollutants are generated on surfaces, such as during welding. 

Supply and exhaust ventilation is a comprehensive system. This type of equipment ensures the simultaneous supply of fresh air and removal of exhaust air. It is responsible for balancing these processes.

Installation of ductless ventilation is applicable when installing ducts is impossible or impractical. Air exchange is provided by mechanical fans in wall structures or window openings. How is the ductless system designed? This is explained through the example of a fan convector: 

  1. The device consists of a casing, inside which there is a heat exchanger (water or electric), a fan, and filters.
  2. The fan ensures air circulation inside the room. As the air passes through the heat exchanger, it is either cooled or heated.
  3. The filters clean the air of dust and suspended particles.
  4. It is controlled remotely or via a control panel. 

Ductless solutions are an addition to centralized ventilation systems. 

Calculation of the ventilation system. 

The calculation of parameters is an important stage preceding installation. In the EU, there are several regulatory documents. They specify the requirements for airflow rates, noise, and the maximum permissible concentration (MPC) of pollutants.

Domestic 

The ventilation system should provide air exchange at a rate of 3 cubic meters per hour for each square meter of living room area. The calculation formula is: V = n * S, where:

  • V – air volume in cubic meters per hour;
  • n – regulatory coefficient;
  • S – building area in square meters.

Example: For a room of 20 m², equipment providing an air intake of 60 cubic meters per hour will be required.

Industrial 

The calculation of industrial ventilation is based on the amount of harmful substances entering the air. The formula is: Q = V × n × ΔP, where: 

Q – air volume (m³/h);
V – room volume (m³);
n – number of air exchanges per hour (1/h);
ΔP – pressure difference between the internal and external environment (Pa).

The calculation takes into account the nature of production, temperature, humidity, the number of people/equipment, regulatory values, heat gains, and pollutants.

Ducted 

For ducted ventilation, the diameter of the ducts and the air velocity in them are calculated. The normative value is taken as between 2 and 5 m/s. The calculation is made using the formula Q = V * S, where Q is the volume of air passing through the duct, V is the velocity, and S is the cross-sectional area.

Ductless 

In ductless ventilation, there are no air ducts. The air volume is calculated using the formula:

Q = Cv × A × ΔP, where:

  • Q – air volume in m³/h;
  • Cv – coefficient of air intake or exhaust through openings (dimensionless);
  • A – area of intake or exhaust openings (in m²);
  • ΔP – pressure difference between the internal/external environment (in Pa).

The main calculation parameter is the air load.

Stages of design: 

When designing, the area, purpose of the building, number of people, heat loads, and air pollution levels are taken into account. The design includes the selection of the ventilation system, calculation of the required throughput, installation of the main ductwork, ventilation equipment, and choice of methods for air purification. Construction and energy standards, as well as noise and vibration requirements, are considered. Engineering calculations and network modeling are performed.

The final document contains the complete specification, technical solutions, and cost estimate.

Domestic 

When installing ventilation of the domestic type, the focus is on creating comfortable living conditions. During the project preparation, it is necessary to distribute supply and exhaust diffusers based on the number of people and ensure noise suppression.

Example project for a 100 sq. m. residential building. 

Equipment: mechanical exhaust with supply unit. Exhaust grilles are installed in the kitchen/bathroom. Ducts are mounted in the ceiling and walls. The supply unit is located in the technical area. The project includes filters for air purification and a heat exchanger for energy savings. Standards for noise insulation and vibration control are met. Durable materials and energy-efficient equipment are used.

Industrial 

When designing a ventilation system for industrial facilities, technological processes, harmful or explosive substances, temperature, and humidity are taken into account. An analysis of the facility is conducted, parameters are calculated, and components are selected. Safety requirements, energy efficiency, and compliance with standards are considered. Technical documentation is prepared, necessary permits and certificates of conformity are obtained—only the availability of all these documents allows the installation of industrial-type ventilation. 

Stages of ventilation installation (sequence):

Stages of installation for residential and industrial ventilation

The assembly of equipment and installation of a ventilation system include the following steps:

  • Preparation, marking, and installation of ventilation ducts.
  • Preparation and installation of components (grilles, filters, etc.).
  • Laying of electrical wiring.
  • Installation of sound insulation, fire protection, etc.
  • Installation and connection of equipment.
  • After installation, commissioning is carried out, including testing, inspection, adjustment, balancing, fine-tuning, and handover of the site.
  • Training and briefing.
  • Technical maintenance of the operating system.

Action plan for domestic ventilation 

The installation sequence includes project development, equipment selection and procurement, duct installation, and adjustment/testing. An important step is insulation and sealing. Insulation minimizes heat loss and prevents outdoor noise intrusion. After installation, balancing is performed to adjust air flow rates and pressure in each duct. Safety requirements must be taken into account, including the installation of air quality monitoring sensors and ensuring system accessibility for maintenance and regular filter cleaning. 

Action plan for an industrial ventilation

The assembly stages include developing technical specifications and the project, selecting/purchasing necessary equipment, installing ducts, setting up ventilation equipment, automation, commissioning, and testing. Automation manages and controls system operation, including installing/configuring sensors, regulators, actuators, and control panels. Commissioning involves equipment checks, parameter adjustments, multiple tests in various modes, and indicator adjustments. 

Exhaust hood installation

Exhaust systems remove contaminated air. In apartments and private homes, exhaust hoods are installed in kitchens. In industrial settings, they are installed at workstations. The exhaust hood is a component of the system responsible for removing used or contaminated air, which contains moisture, odors, dust, and vapors. Structural elements include ventilation grilles or exhaust fans, which create negative pressure, drawing and expelling air.

In an apartment kitchen 

The exhaust hood removes odors, grease, and combustion products. It consists of an exhaust fan and a connected duct. It is equipped with a filter to capture grease particles. Sufficient performance and correct connection to the ventilation system must be ensured. 

In a private house kitchen 

In a private house kitchen, the installation of the exhaust hood differs from that in an apartment. The integration with the home’s engineering communications, the kitchen type, and the number of cooking surfaces are taken into account. The distance to air sources must be considered, and the system should be airtight. Installing the exhaust hood in a private house may require running ducts through ceilings or load-bearing walls. 

In the workshop at the production 

When installing in a workshop, technological processes, types, and quantities of harmful substances must be taken into account. It is necessary to select an exhaust system with the required level of protection and performance. Installing an exhaust system in a workshop requires consideration of the building’s large size and air volumes.

Installation of supply ventilation 

At the initial stage, an analysis of the facility is conducted, and the required parameters are determined. Then, suitable equipment is selected to reduce the spread of dust, microorganisms, and allergens. The installation of air ducts and supply equipment (filters, fans, heat recovery units) is carried out. Let’s look at the installation stages for residential/industrial objects.

  • Residential
    The installation of supply ventilation in residential buildings ensures the intake of fresh air, creating comfortable living conditions. The characteristics of the rooms, requirements for noise levels, air temperature, and humidity levels are taken into account. Regular technical inspection and cleaning of the supply ventilation system are necessary to prevent contamination.
  • Industrial
    In industrial facilities, it is essential to ensure quality air exchange over large areas. The air must be fresh and free from contamination. The assembly includes several stages. First, preparation is carried out, including the development of the ventilation system project, equipment, and components procurement. Then, air ducts and ventilation chambers are installed. The final stage involves adjusting and testing the system, as well as its commissioning.

Installation of supply and exhaust ventilation.

The supply and exhaust ventilation system ensures a constant air exchange. The installation includes organizing two main flows: fresh air intake from outside and exhaust of used air. This makes the system versatile. The equipment is suitable for residential homes and industrial areas.

Residential

A supply and exhaust ventilation system is essential for creating a healthy indoor climate in a house or apartment. Installing this equipment provides fresh air intake and removes unwanted odors, dust, and moisture.

Assembly steps:

  • Determine connection points and the required system capacity.
  • Install air ducts and grilles according to the design. Ventilation ducts may be flexible or rigid, depending on requirements.
  • Lay cables and connect ventilation devices.
  • Install the control system, which provides equipment monitoring and adjustment.
  • The final stage is commissioning, which includes testing and setting optimal parameters.

Industrial

Installation of industrial supply and exhaust ventilation involves several steps. First, a project is developed based on client requirements and regulatory standards. Next, ducts and mechanisms are installed according to the design documentation. Channels are laid, and ventilation devices are set up. The system is connected to power and automatic control. In the final stage, equipment is adjusted and tested.

Duct installation

Ducts ensure the movement of air from the intake point to the exhaust points. The quality of the duct installation affects the efficiency of the entire ventilation system. Classic duct types include round and rectangular metal ducts. There are also more modern options made from plastic or sandwich panels. The installation of ducts starts with designing the route, which influences the efficiency of the ventilation system. Then, the necessary equipment and materials are selected and purchased.

Duct installation occurs in several stages:

  1. Preparation of the installation site: Cleaning and preparing surfaces for duct attachment.
  2. Installation of fastening elements: This includes installing hangers, brackets, and other mounting components.
  3. Duct installation: The ventilation duct is placed on the prepared mounting elements, then fixed, with sections assembled.
  4. Installation of fittings: This includes the installation of dampers and inspection doors.
  5. Leakage test: After installation, a leakage test is conducted to ensure airtightness.
  6. Use of galvanized, round, vertical, rectangular, flexible, exhaust, polypropylene, textile, and insulated ducts.

Duct installation is a complex process that requires strict adherence to ventilation installation regulations.

The importance of silencers 

Silencers are an important component of ventilation systems, responsible for reducing noise levels during the operation of equipment. Noise creates discomfort for residents or workers and, in some cases, can lead to violations of acoustic standards. The device works on the principle of sound wave absorption. A special material is embedded in the casing, which absorbs sound, thereby reducing its intensity.

The importance of filters 

Filters in ventilation systems play a crucial role in ensuring clean air and a healthy microclimate. They filter the air by removing dust particles, allergens, and bacteria. There are various types of filters:

  • Mechanical filters (fine/coarse cleaning) capture particles on their surface.
  • Activated carbon filters are used to remove odors and gases.
  • HEPA filters provide highly efficient cleaning of the finest particles.
  • Electrostatic filters use electricity to attract and hold particles.

These filters clean the air passing through them, with each type using different technologies to trap contaminants, ensuring the air remains clean and safe.

Types of connections

In ventilation equipment, various types of connections are commonly used to ensure reliability and structural strength. The selection of components depends on the operating conditions and system requirements. In the following sections, we will examine flange and bandage connections.

Flanged Connection
A flanged connection provides high reliability and strength for air ducts.
A flanged connection is used in systems where high reliability and strength are required. Flanges are special fittings mounted on the ends of the parts being connected. They have holes for bolts or screws, ensuring a stable, tight connection between two objects.

Advantages:

  1. High strength and reliability.
  2. Ability to disassemble without damaging components.

Disadvantages:

  1. Complexity of installation.
  2. Need for additional equipment (bolts, nuts, seals).

The flange connection provides high strength, but requires a more careful approach during installation.

 Bandage Connection
A bandage connection is used in systems where flexibility and the ability for quick disassembly are required. A metal or plastic bandage, or clamp, wraps around the outer side of both pipes. A sealing ring ensures tightness. Bandages are used where a temporary or removable connection is needed.

Advantages:

  1. Ease of installation/removal.
  2. Flexibility.

Disadvantages:

  1. Lower strength compared to flanged connections.
  2. Possibility of air leakage at connection points.

A bandage connection is preferred in systems where flexibility and quick disassembly are important.

Thermal protection and insulation of air ducts 

Thermal insulation and heating of air ducts. By protecting the air ducts from unwanted heat loss, thermal insulation helps maintain the microclimate inside the building. This is especially important for regions with harsh climates, where the external temperature can differ significantly from the internal one. Characteristics of materials for insulating ventilation ducts include good thermal insulation properties, waterproofness, breathability, and fire resistance.

Installation of ventilation grille 

Ventilation grille. Grilles serve two functions – allowing air to pass through the system while preventing foreign objects and dust from entering the ducts.

Installation steps:

  1. Measurement: Determine the size of the opening and choose a grille that fits.
  2. Preparation: Clean the opening of any dust or debris.
  3. Installation: Insert the grille into the opening and secure it with fasteners (screws, clips, special clamps).
  4. Inspection: After installation, ensure the grille is securely fixed and does not obstruct airflow.

A properly installed grille ensures even air distribution and prevents drafts.

Монтаж клапанов

Ventilation Valve. Valves are essential components in ventilation systems that regulate airflow, prevent backdraft, and help maintain temperature within a building. Proper installation of these elements ensures the system operates effectively.

Installation steps:

  1. Determine valve placement: Ensure the location is accessible for maintenance and servicing.
  2. Select the valve size: Choose the correct size based on the duct diameter.
  3. Install according to the manufacturer’s instructions: Ensure the valve is oriented correctly to allow proper airflow direction.
  4. Secure the valve: Use specialized fasteners to ensure the valve is securely installed and prevent vibrations.
  5. Test the valve after installation: Check the valve’s operation to ensure it works as expected.

Regulating valves control airflow within the system. Backdraft valves prevent reverse airflow, while shut-off valves block airflow in the duct. Butterfly valves are used for quick air shutdowns.

Ductwork installation 

Duct Box. Duct boxes are specialized structures that ensure the concealed installation of air ducts. They conceal the ducts, provide additional sound insulation, and protect the ducts from mechanical damage.

  1. The installation process begins with project development. The size, shape, and material of the box are determined.
  2. Next, the box is fabricated and installed on walls or ceilings using fasteners.
  3. It is important to ensure that access to the ducts is provided for potential maintenance and repair.

After the boxes are installed, the ducts are placed inside and secured. The system is then tested for leaks, and airflow velocity measurements are taken.

Diffuser installation 

Ventilation Diffuser. Diffusers evenly distribute air throughout the room. They help create comfortable living and working conditions, improve the microclimate, and reduce the likelihood of drafts.

Step-by-step Installation:

  1. Review the ventilation system project: Determine the locations for installation.
  2. Create openings in the ceiling or wall: Make holes according to the size of the diffuser.
  3. Install the diffuser: Use special fasteners or anchors for secure mounting.
  4. Connect to the ductwork: Attach the diffuser to the ventilation system.
  5. Test and adjust: Check the operation and make necessary adjustments.

The selection of diffusers should be based on the specifics of the room and project requirements.

Automation – control system

Automation Control Unit. Automation is a system of devices and software that allows the automation of airflow management, regulating its speed, direction, and temperature. The main component of automation is the controllers, which ensure interaction between various system elements. These devices control the operation of fans, dampers, temperature and humidity sensors, and other equipment. To implement automatic control, various methods and technologies are used, including specialized software and artificial intelligence. Automation operates in several modes: automatic, semi-automatic, and manual.

Commissioning and final testing 

Commissioning (P&ID) Works – a crucial stage after the installation of the ventilation system. It includes checking all components and their correct interaction to ensure safe system operation. Even the smallest installation error can lead to reduced system efficiency, malfunction, or even failure.

Stages of Commissioning Works:

  1. Compliance with the Project: Ensure that the system complies with the developed design specifications.
  2. Verification of Installation: Check that all components of the system are correctly installed and functioning.
  3. System Start-up and Operation Test: Operate the ventilation equipment in different modes and check for discrepancies in air volume, airflow quantity, or discrepancies in airflow measurements.
  4. Noise and Vibration Check: Measure the noise and vibrations during system operation.
  5. Adjustment for Efficiency and Comfort: Adjust the system for optimal performance and comfort.

After commissioning, the contractor hands over documentation to the client, trains them on how to operate the system, and provides ongoing technical support.

Our offer

SVT Group offers engineering solutions in the field of ventilation and air conditioning. We work with large-scale industrial and commercial projects. We maintain communication with the client at every stage of the project: from the initial discussion and design to post-installation technical support.

Demolition and dismantling of buildings and structures

Demolition and dismantling of buildings and structures is a complex, controlled process aimed at eliminating a capital construction object. The work includes the preliminary dismantling of engineering systems, technical equipment, and finishing elements of the building, followed by its destruction through the disassembly of prefabricated structures or the collapse of monolithic ones. The demolition of a residential house or the dismantling of industrial buildings occurs when the object:

  • is in an emergency condition;
  • is subject to demolition by the owner’s decision;
  • has significant physical and moral wear;
  • is being demolished in accordance with the urban planning plan.

Partial dismantling of panel buildings, brick houses, or monolithic structures is also possible in the case of major renovations.

Dismantling methods

The method of building demolition is chosen based on the structural features, size, and materials of the object.

  1. Manual method – the most labor-intensive. It is typically used for small buildings or during major renovations. Gas cutting equipment and hand tools (sledgehammers, picks, etc.) may be used.
  2. Semi-mechanical method – used in confined spaces or for partial demolition. Tools like angle grinders, concrete breakers, and jackhammers are used.
  3. Mechanical method – employed when there is sufficient space around the building to ensure safety for nearby objects. High-reach bulldozers with attachments, excavators for collecting bricks and other debris, are used.
  4. Combined method – combines the three methods mentioned above. For example, when demolishing a high-rise building, internal elements may be dismantled semi-mechanically, while external walls are demolished mechanically.
  5. Explosive method – typically used for the demolition of high-rise buildings or industrial buildings located far from other structures. Given the complexity and danger of the work, the company performing the work must have a special license for conducting demolition by explosives.

What companies can perform dismantling

Demolition services can only be provided by specialized companies. They must have:

  • The necessary licenses for performing the work;
  • Membership in an SRO (Self-Regulatory Organization of Builders);
  • A work permit for safe execution of the tasks.

The company’s workers must have the appropriate qualifications, which must be documented.

Stages of dismantling

Demolition and disposal of buildings is a complex process that consists of several stages.

Development of Design and Estimate Documentation

At the initial stage, a demolition and disposal project is developed. The contractor follows standards and regulations when creating this documentation.  

For explosive work or the demolition of high-rise buildings, a separate document called “Special Technical Conditions” (STU) is created, which is also included in the project documentation.

Approval

The developed project is submitted for expertise. Once the document is approved, the contractor gains the right to carry out the work. After this, the demolition must be coordinated with municipal utility services, and all communication systems must be shut down. Additional approvals may be required depending on the specifics of the demolished object.

Demolition Works
After receiving a positive conclusion from the expert review and obtaining all necessary approvals, the demolition of the object itself is carried out. The stages of work include:

  1. Fencing off the construction site.
  2. Disconnecting all utilities in the building.
  3. Dismantling the roof and floor structures on the upper floors.
  4. Step-by-step demolition of load-bearing and non-load-bearing walls, floors, partitions, etc., on the middle and lower floors (in a multi-story building).

If the building is completely demolished and the safe distance from other structures is maintained, powerful special equipment such as bulldozers and demolition excavators with attachments may be used. After the work is completed, recyclable waste (brick rubble, metal structures, etc.) is transported to recycling facilities, while other materials are disposed of at landfills.

Preparation of the Survey Report

Once the work is completed, the site is inspected by a cadastral engineer. They prepare a special report, a document based on which the former building is officially removed from the registry.

Demolition of buildings and the removal of brick and concrete debris is a service provided by SVT Group. We have many years of experience in carrying out this type of work and possess all the necessary documentation for its execution.